HACCP - HAZARD ANALYSIS CRITICAL CONTROL POINT

  • Home
  • HACCP - HAZARD ANALYSIS CRITICAL CONTROL POINT
Image

HACCP Consultancy Procedure

This table outlines the key consultancy activities for implementing HACCP principles and ensuring compliance with food safety standards. Timelines are subject to adjustment based on the organization’s complexity and scope.

HACCP Consultancy Activities and Timelines
# Activity Description Timeline
1 Initial Consultation and Assessment Meet with key stakeholders to understand the scope of the process, identify key products, and discuss objectives. 1–2 days
2 Preliminary Review of Existing Systems Review current food safety practices, existing procedures, and documentation. Identify gaps. 2–5 days
3 Formation of HACCP Team Identify and assemble a cross-functional team (e.g., production, quality, and safety personnel). 1–2 days
4 Product Description and Flow Diagram Development Define and document the product(s), ingredients, processing steps, and create a process flow diagram. 3–5 days
5 Hazard Analysis Identify potential hazards (biological, chemical, physical) at each step and assess associated risks. 5–7 days
6 Critical Control Point (CCP) Determination Identify Critical Control Points (CCPs) where control is essential to food safety. 3–5 days
7 Establish Critical Limits for Each CCP Set acceptable limits for each CCP (e.g., temperature, time, pH level). 3–5 days
8 Develop Monitoring Procedures for CCPs Define monitoring methods to ensure control measures are maintained at each CCP. 2–4 days
9 Establish Corrective Actions Define procedures for handling deviations from critical limits at each CCP. 2–4 days
10 Verification Procedures Establish procedures for verifying that the HACCP system is working (e.g., audits, testing). 3–5 days
11 Documentation and Record Keeping Create necessary documentation and templates to track monitoring, corrective actions, and verification. 3–5 days
12 Staff Training on HACCP Principles Provide training for staff involved in food safety, emphasizing the importance of their roles. 1–2 days
13 Review and Finalization of HACCP Plan Review the entire HACCP plan, including all procedures, and finalize it for approval. 2–3 days
14 Implementation Support Assist with the implementation of the plan and provide support during initial stages of operation. 1–3 months
15 Internal Audit and HACCP Re-assessment Conduct periodic audits to assess system effectiveness and ensure continuous improvement. 6–12 months